Basic Area Management

5S - Five implementation steps to improve the work place
5S  is a concept of a series of basic operations to organize work areas with the aim of ensuring better quality, safety, and productivity.
2 basic start of 5S ; Sorting out and Set up
SORTING  - key point "Only Necessary Goods in the Work Area and In Limited Amount"
Flow Process to do Sorting out
flow sorting out - 52
do identification by sticking red tag label

7 Days Rule -  all red tag should be done in a week. we have to decide what to do for the item with the red tags.
Red tag can be sticky by "any one" in that area, and should be review by supervisor or above.
SET UP - key point "every Item / Goods clear storage and place"
5 STEPS TOWARDS:
  1. Grouping of goods (e.g type,  Size, shape, function)
  2. Prep the place
  3. Border marking between places
  4. Assigning an identifier /  Identification of goods
  5. Map / placement plan of goods
Set up
all above 2 best practice and practical activity to do first two step of 5S in your working area.

Komentar

Postingan populer dari blog ini

Maintenance Planning

Maintenance Planning for daily abnormality findings. This chapter will talk about maintenance planning in more practical way and simple. Most of source  I got from "Maintenance Planning and Scheduling Handbook" by Richard  D. Palmer. and by my experience as Maintenance planner for more than 5 years . What is Maintenance planning ? and how it impact to daily maintenance jobs ? Maintenance planning for daily abnormality is about how we can arrange our daily machine abnormality in the field, create work package, execution, and job priorities. so that it will affected to our daily maintenance performance, less backlog, cost, loss time, and man power arrangement. in this case, daily maintenance planning should be done by Maintenance planner. for planning principle I suggest you refer to Maintenance planning and scheduling Hand book by Richard D. Palmer. Now, I will share simple way to arrange daily maintenance planning for abnormality findings in the field, followed b...

Autonomous Maintenance ( AM ) ; Step 1 - Cleaning by Inspection

AM is one of TPM pillars, the meaning of AM is Self-Care . Production process operator acts as " First Line Maintenance ",   Machine maintenance is not only the responsibility of maintenance section, but also the production people who run the machine. this part I would like to share how to develop AM  Step 1 - Cleaning by inspection in best practice way. "Cleaning by Inspection" means that operator who run the machine beside doing production control and  parameter setting, they also perform machine inspection that followed by cleaning activities, why ? Deterioration of production and machine efficiency usually cause by less attention to the " Basic Machine Condition " in where basic machine condition consist of contamination, lubrication, tightening, inspection, precision check.  almost root cause of all problem in the machine came from basic machine condition, and of course there is one more thing  that is Man Mistake ( e.g. People not do inspection, ...